Our projects

installation of chw line

Complete installation and commissioning of 1200 meters pre-insulated chilled water (CHW) supply and return pipelines at Dubai Discovery Garden, the scope includes:

· Excavation and making trench for CHW lines

· Sand Bedding and Laydown of CS pipeline

· Welding, Field joint insulation,

· Testing, flushing, and Commissioning

· System handover.

hot tapping on chw line

Installation of flow stop on 350mm line for modification line without line shutdown

Replacement of defected isolation valves

Removal of defected 1000mm butterfly valve and replacement with new valves